![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & equipment to hack wall & floor tiles for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to lay water proofing membrane for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to lay full height wall tiles for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to lay floor tiles for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to construct shower kerb for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to install tempered glass shower screen for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Design & fabricate 2ft suspended vanity cabinet for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to run concealed cold water pipes for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to re-wire both bathrooms (concealed wiring).
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to install 2 set of bathroom accessories.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to install 2 sets of WC.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to install 2 sets of instant heater.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to install 2 sets of wash basin.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to install 2 sets of aluminium bi-fold doors.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to construct false ceiling for both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply and install 8 units of L.E.D. down lights.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to pain ceiling of both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Haulage service, supply of sand & clearing of debris.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Supply labour & materials to chemical wash affected areas after completion of renovation.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Interior design and space planning.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Floor plan layout.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Materials and color proposal cum selection.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Site co-ordination and supervision