Description
三房式组屋 SGD16,688
四房式组屋 SGD16,988
五房式组屋 SGD17,288
EA组屋 SGD17,888
专业服务
Professional Services
室内空间与家具布局规划。
1.Interior Space & Furniture Layout Plan
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
1.Interior Space & Furniture Layout Plan
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
2.Design & Furnishings Consultation
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
3.Perspective Drawings On Carpentry Works Only
(Max 2 amendments)
(Drawings For Illustration & Viewing Only)
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
4.Materials & Colour Proposal
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
5.Project Management & Site Supervision
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
6.1 Years Warranty
瓦砌工作
Masonry Works
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
7.Construction of 50mm cabinet base
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
8.Construction of 50mm fridge base
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
9.Construction of 50mm washing machine base
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
10.Construction of 50mm shower kerb at master bedroom
水管工工作
Plumbing Works
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
11.Extension of copper piping to sink position
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
12.Laying of concealed drainage pipe at kitchen sink position
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
13.Laying of concealed drainage pipe at washing machine position, if required
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
14.Labour for installing 1 storage heater or 2 instant heaters
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
15.Labour for installing accessories at 2 bathrooms
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
16.Labour for installing 2 sets of hand-held bidet spray
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
17.Labour for installing kitchen sink, complete with inlet & outlet connections
玻璃工作
Glass Works
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
18.Supply & install 10mm clear tempered glass swing door shower screen at master bathroom (Size:<L1800mm × Ht1800mm)
木工工作
Carpentry Works
Laminate Finish with Colour PVC Carcass
Based on ceiling height of 2600mm
设计并安装特色电视背景墙含灯带。
19.Design & fabricate TV feature wall with cove light pelmet
Size: L2400mm × Ht<2100mm (Full Height)
Provision of lighting point/s not inclusive
设计并安装特色电视背景墙挂壁电视柜含4个抽屉。
20.Design & fabricate suspended low TV console
Size:L2100mm × Ht300mm
4 sets of D450mm drawers / pocket doors with Blum Full Extension Soft-closing Tandem runners, or Blum Soft-closing hinges
设计并安装平开门定制衣柜含4个抽屉。
21.Design & fabricate casement door built-in wardrobe c/w
Size: L1500mm × Full Height
4 sets of D450mm drawers with Blum Full Extension Soft-closing Tandem runners
Blum Soft-closing hinges
设计并安装顶挂式书柜。
22.Design & fabricate top hung suspended book cabinet
Size: L1200 × Ht1100 × D350
2 sets of Blun HK uplifter
设计并安装写字/办公桌含抽屉。
23.Design & fabricate study/work desk with drawers
Size: L1200mm × Ht760mm × D500mm
3 sets of D450mm drawers with Blum Full Extension Soft-closing Tandem runners
Laminate Finish with Colour PVC Carcass
Based on ceiling height of 2600mm
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
19.Design & fabricate TV feature wall with cove light pelmet
Size: L2400mm × Ht<2100mm (Full Height)
Provision of lighting point/s not inclusive
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
20.Design & fabricate suspended low TV console
Size:L2100mm × Ht300mm
4 sets of D450mm drawers / pocket doors with Blum Full Extension Soft-closing Tandem runners, or Blum Soft-closing hinges
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
21.Design & fabricate casement door built-in wardrobe c/w
Size: L1500mm × Full Height
4 sets of D450mm drawers with Blum Full Extension Soft-closing Tandem runners
Blum Soft-closing hinges
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
22.Design & fabricate top hung suspended book cabinet
Size: L1200 × Ht1100 × D350
2 sets of Blun HK uplifter
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
23.Design & fabricate study/work desk with drawers
Size: L1200mm × Ht760mm × D500mm
3 sets of D450mm drawers with Blum Full Extension Soft-closing Tandem runners
** Item 22 & 23 can be exchanged for upto 6ft casement door built-in wardrobe c/w
Size: L1800 × Full Height
4 sets of D450mm drawers with Blum Full Extension Soft-closing Tandem runners
Blum Soft-closing hinges
设计并安装20英尺厨房吊地柜。
24.Design & fabricate top & bottom kitchen cabinet c/w
Size: L20ft
5 sets of D450mm drawers with Blum Full Extension
Soft-closing Tandem runners
2 sets of Blum Aventos HK uplifters
包工包料10英尺地柜台面。
25.Supply & install 10ft quartz worktop
Base on selected range Caesarstone worktop
包工包料1套不锈钢碗碟柜。
26.Supply & install 1 set of 304 stainless steel dish rack
Size: L1800 × Full Height
4 sets of D450mm drawers with Blum Full Extension Soft-closing Tandem runners
Blum Soft-closing hinges
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
24.Design & fabricate top & bottom kitchen cabinet c/w
Size: L20ft
5 sets of D450mm drawers with Blum Full Extension
Soft-closing Tandem runners
2 sets of Blum Aventos HK uplifters
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
25.Supply & install 10ft quartz worktop
Base on selected range Caesarstone worktop
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
26.Supply & install 1 set of 304 stainless steel dish rack
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
27.Supply labour to install hood & hob
Provision of electrical point/s not inclusive
其他 / 常规工作
Miscellaneous / General Services
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
28.Supply & paint all internal walls with Nippon odourless All-in 1 paint (near zero Volatile Organic Component)
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
29.Supply & paint all internal walls with sealer express coat
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
30.Supply & paint all internal ceiling with Nippon Matex paint
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
31.Laying of cardboard protection on affected flooring
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
32.Laying of cardboard protection for main door (Ht1500mm only)
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
33.Chemical washing
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
34.General cleaning upon completion
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
35.Uplifting of goods to premises