Description
两室一厅 SGD15900
三室一厅 SGD17900
四室一厅 SGD19900
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and lay homogeneous tile for kitchen floor.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and lay waterproofing membrane for kitchen floor.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and construct cement base for kitchen cabinet.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and construct cement base for fridge.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and install 1 pc stainless steel panel for cooker area.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To fabricate and install 25ft kitchen cabinet.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To fabricate and install 15ft postform table top.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and install 2 pcs sand blasted glass door for kitchen cabinet.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and install stainless steel dish tray for kitchen cabinet.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and lay floor tile for common bathroom.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and construct shower kerb for common bathroom.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To fabricate and install 3ft wooden cabinet for vanity top.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and install one under mount basin for vanity top.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and install 3ft solid surface for vanity top.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To fabricate and install 3ft x 3ft mirror above vanity top.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and install aluminium bi-fold door for common bathroom.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and lay waterproofing membrane for common bathroom.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and lay floor tile for master bathroom.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and construct shower kerb for master bathroom.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and install 1 set acrylic sliding shower screen.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and install aluminium bi-fold door for master bathroom.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To supply and lay waterproofing membrane for master bathroom.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To hack and demolish floor tile for kitchen and both bathrooms.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
To hack and demolish existing kitchen cabinet.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Interior design and space planning.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Perspective drawing.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Materials and colour proposal and selection.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Site co-ordination and supervision.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Projected work schedule chart.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Chemical wash.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Application of permit from relevant authorities.
![](http://www.boostsg.com/wp-content/uploads/2017/01/38.png)
Haulage and debris clearance.